Large_project_738x361_AreaC_2

Mining Area C to Yandi Railroad Site Preparation

This project included the site preparation and relocation of services for the 40 km rail extension from Yandi to Mining Area C.
Site preparation consisted of:

  • Clearing and pad formation.
  • Roads and vehicle washdown area.
  • Services to offices.
  • Signage and security gates.
  • Fuel facility.

Relocated services included:

  • High (1 kv and 33 kv) and low voltage supply.
  • Dewatering and potable water pipelines.
  • Telephone and fibre optic cables.